Shipbuilding and offshore
You build ships or offshore structures
The welding and NDT you do is set by class rules, and a surveyor witnesses the work as it happens — the evidence has to be ready at the hold point, not assembled after it.
Runs on Fabrication suite, underUNI EN ISO 3834.
What it costs you today
Where the record breaks.
Surveyor witness and hold points punctuate the whole build
A classification-society surveyor witnesses defined stages and signs off at hold points — fit-up, welding, NDT results, pressure and tightness tests. The work cannot pass the point until the records for it are in front of the surveyor, complete and reconciled. When the weld log, the NDT reports and the material documents live in separate piles, every hold point becomes a scramble to assemble the evidence before the surveyor's visit.
Cost Surveyor visits that stall the schedule, and stages re-witnessed because the paper was not ready
Weld volume and traceability at a scale paper cannot hold
A hull or a jacket is tens of thousands of metres of weld across thousands of joints, each carrying a procedure, a welder, a material and a heat. Class rules want that chain intact from the mill certificate to the weld map. On a spreadsheet the size alone guarantees drift — joints that never got logged, welders whose qualification lapsed mid-block, heats that no longer match.
Cost Traceability gaps found deep in a block, and days rebuilding the weld map under the surveyor's deadline
NDT extent set by the rules, tracked by hand
The volumetric and surface examination extent — a percentage of welds by joint type and location, raised in critical areas — is fixed by the applicable class rules and read against their acceptance criteria. Deciding that extent joint by joint across a build this large, and tracking which welds have been shot, read and accepted, is exactly where coverage quietly falls short of what the rules require.
Cost Under-inspection that surfaces as a class finding, and radiography backlogs hidden inside the block schedule
Who this is for
You build ships or offshore structures — hulls, superstructures, jackets, topsides, subsea structures.
Your product is welded steel at enormous scale. The work is governed less by a single directive than by the rules of a recognised classification society, with a surveyor present through the build to witness it.
The welding, the NDT and the inspection are the work. The class regime is the layer laid over it, and it decides:
- how much you examine,
- how you prove it,
- who has to watch.
The rules that govern the work
Shipbuilding and offshore fabrication are built and examined to the rules of a classification society. The recognised societies each publish rules for hull construction and for offshore structures, and the applicable set drives the welding and NDT requirements for the project.
Those rules fix the things that shape the shop:
Welding is done under a quality system. Class rules require welding to be carried out under a welding quality management framework consistent with ISO 3834, with qualified procedures and qualified welders.
Procedure qualification and welder qualification are to the recognised standards, approved for the ranges the joints actually need.
Examination extent and acceptance are set by the rules. The volumetric and surface NDT extent is a percentage by joint type and location, raised in critical and highly-stressed areas, with acceptance read against the class rules and their referenced criteria.
The extent is a rule the build has to hit and prove, weld by weld.
A surveyor witnesses the work. Class surveyors attend defined stages and sign off at hold points.
The evidence for each stage has to be complete and reconciled at the point the surveyor witnesses it — the record is not something assembled after the fact.
Worgify treats the class regime as a switchable layer over the work, not as a separate product. You run the ISO 3834 / class layer on the shop, and the same weld map carries the surveyor’s hold points.
Where Worgify fits
Worgify Fabrication is one system for the yard, with the regime switched on as a layer per project:
- Welding management that holds your WPS, procedure qualifications and welder qualifications as live records and computes the qualified range from the essential variables — material group, thickness, position, throat. So “does this procedure and this welder cover this joint” is answered by the engine across tens of thousands of welds, and a welder whose qualification lapses mid-block is caught before the next joint, not at turnover. That is the ISO 3834 core the class rules rest on.
- Inspection and ITP driven by the class rules: the plan fixes the surveyor’s witness and hold points and the NDT extents by joint type and location, tracks which welds have been shot, read and accepted, and surfaces repair rates as they build. So coverage is what the rules require by construction, and the evidence for a hold point is ready when the surveyor arrives instead of scrambled together before the visit.
- The MRB/MDR dossier built as work happens — material certificates (EN 10204), welding records, NDT reports, tests and surveyor sign-offs linked to the joints and stages they belong to, reconciled to one weld map. The class dossier is a by-product of doing the work correctly, not a reconstruction project after the block is closed.
The build only moves when the surveyor can sign, and the surveyor can only sign what the record shows. Worgify makes that record ready at every hold point.