Welder continuity log. A free Excel template, and what it must show.
Every welder and every certificate on one sheet: the six-monthly confirmations, the revalidation dates, and the evidence behind them.
What's in the file.
The template's columns, with the example rows it comes with. In the file the example rows are grey: overwrite them or delete them.
| Welder | Stamp / ID | Certificate no. | Standard | Process | Qualification (designation / scope) | Qualification date (test) | Validity route | Last retest / prolongation | Last confirmation (ISO) / last weld with the process (ASME) | Next confirmation due (auto) | Days left (auto) | Status (auto) | Revalidation due (auto) | Confirmed by (name, role) | Evidence (job / joint / weld record) | Notes |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| J. Smith (example) | W-07 | CB-25-0418 | ISO 9606-1 | 135 | ISO 9606-1 135 P BW FM1 S t10 PF ss nb | 18 Sep 2025 | 9.3 b – prolong every 2 years (2 welds tested) | 15 Sep 2026 | 15 Mar 2027 | 139 | OK | 18 Sep 2027 | A. Clarke, welding coordinator (IWE) | Job 2604: joints 0981-W02 to W09, weld log 8–14 Sep 2026 | ||
| R. Patel (example) | W-12 | CB-24-0977 | ISO 9606-1 | 141 | ISO 9606-1 141 T BW FM1 S t3.6 D60 H-L045 ss nb | 20 May 2024 | 9.3 c – valid while confirmed (ISO 3834-2/-3) | 15 May 2026 | 15 Nov 2026 | 19 | Due soon | While 9.3 c holds | A. Clarke, welding coordinator (IWE) | Job 2598: spool S3, welds S3-W01 to W06, weld log 12 May 2026 | ||
| D. Moore (example) | W-15 | WPQ-0031 | ASME IX | GMAW (135) | GMAW, F-No. 6, ranges as on WPQ (QW-484) | 1 Aug 2023 | ASME IX – lapses after 6 months without the process | 30 Mar 2026 | 30 Sep 2026 | -27 | Overdue | None (continuity only) | A. Clarke, QC | Job 2570: joints 77-W12, 77-W13, weld log 30 Mar 2026 | No GMAW since March: renew under QW-322.2 before assigning |
Next due and revalidation come from the dates in the row. Days left and status are worked out from today's date when you open the file; here they are shown as on 27 October 2026.
Scroll sideways to see every column.
Download the template.
- Excel workbook (.xlsx), 33 KB
- 3 sheets: How to use, Continuity log, Lists
- No macros, no links to other files
- Opens in Excel, LibreOffice and Google Sheets
welder-continuity-log.xlsx
In Worgify every recorded weld counts as the welder's continuity, expiries are flagged ahead, and a lapsed welder cannot be assigned to a joint.See welder qualification trackingBook a demo
What a continuity log is for
A welder's certificate has a date on it, but the date alone doesn't keep it valid. Under ISO 9606-1 and under ASME IX a qualification stays alive only while the welder keeps welding with the process, and only if someone records that they did. The continuity log is that record: one row per welder and per certificate, the last time continuity was confirmed, the next date it's due, and the job records that prove it.
It answers the question an auditor or your client's inspector will ask sooner or later: was this welder qualified on the day they welded this joint? If the log can't answer it, the certificate in the folder won't either.
What ISO 9606-1 asks
The standard is EN ISO 9606-1:2017, the European adoption of ISO 9606-1:2012. Two clauses set the dates in this log.
- Confirmation every six months (9.2). The welding coordinator, or the examiner or examining body, confirms that the welder has worked within the range of qualification. If it isn't confirmed, the certificate becomes invalid. A signature added after the six months doesn't cover the gap.
- 9.3 a. The welder is retested every three years.
- 9.3 b. Every two years, two welds made in the last six months of the validity period are tested by radiography, ultrasonic testing or destructive tests, and the records are kept with the certificate.
- 9.3 c. The qualification stays valid as long as it's confirmed every six months and the conditions hold: the welder works for the same manufacturer, the manufacturer's quality system is verified to ISO 3834-2 or ISO 3834-3, and the manufacturer documents that the welder produces welds of acceptable quality to the application standard.
The prolongation method is chosen when the certificate is issued and is written on it. Under 9.3 c the six-monthly confirmations are the whole story: miss one and there's nothing left to prolong. Under 9.3 b the two welds have to come from the last six months before the date, so plan them early.
What ASME IX asks
ASME IX works per process. Under QW-322.1(a), a welder who hasn't welded with a process for six months or more loses their qualifications for that process. Each time they weld with it, the six months start again, and that keeps every qualification they hold for that process. So for an ASME welder the log needs one date per process: the last time they used it.
- An expired qualification can be renewed under QW-322.2 by welding a single test coupon. A pass brings back the welder's previous qualifications for that process.
- When there's a specific reason to question a welder's ability to make welds that meet the specification, the qualifications that support the welding they're doing are revoked (QW-322.1(b)). The others stay. Write the reason in the notes.
Section IX itself sets no calendar expiry beyond continuity. A construction code, your client or your own quality manual may add one; if so, note it in the row.
How to fill it in
- One row per welder per certificate. A welder with a 135 plate certificate and a 141 tube certificate has two rows and two clocks.
- Stamp / ID. The mark the welder puts next to each weld, or records against it. It's what ties this row to the joints in your weld map and weld log.
- Qualification. Copy the designation from the certificate, for example ISO 9606-1 135 P BW FM1 S t10 PF ss nb. You need it to judge whether a job's weld counts as evidence: the weld must sit inside that range.
- Qualification date. The date the test piece was welded. Validity starts from it.
- Validity route. The prolongation method on the certificate (9.3 a, b or c), or ASME IX.
- Last confirmation. For ISO, the date of the latest six-monthly signature. For ASME, the latest date the welder used the process.
- The four (auto) columns. Next due is six months after the latest of the qualification date, the last retest or prolongation, and the last confirmation. Revalidation is three years (9.3 a) or two years (9.3 b) from the test or the last revalidation. Status turns amber 30 days before a confirmation and 180 days before a revalidation, and red once a date has passed.
- Confirmed by and evidence. Name and role, then the job, the joints and the weld record that show the welder worked within the range. This is the column auditors read.
Common mistakes
- Watching only the date on the certificate. A certificate can show an expiry two years away and already be invalid, because a confirmation was missed.
- Signing a year of confirmations in one go before an audit. The signature says the welder worked within the range; without the evidence column it says nothing.
- Evidence outside the range. Welding 141 on tube doesn't confirm a 135 plate certificate.
- One row per welder instead of one per certificate. Two certificates, two clocks.
- Applying the ISO rule to an ASME qualification, or the other way round. ASME counts from the last weld with the process; ISO counts from the last confirmation.
- Route 9.3 b left to the last month. The two welds must come from the last six months: if nobody planned them, the only route left is a new test.
Where a spreadsheet stops
This file does the date arithmetic, and for a handful of welders that's often enough. It stops working as the shop grows. It knows only what someone types in: when a welder welds a joint, nobody updates the row. It doesn't remind anyone, because the colours change only when someone opens the file. The evidence column is text, with no link to the joint that was actually welded. And nothing stops a lapsed welder from being put on the next job, or checks that the joint is inside the ranges of their certificate.
In Worgify, every weld recorded on a joint counts as continuity for the welder who made it, confirmations and revalidations are flagged before they fall due, and a welder whose qualification has lapsed, or doesn't cover the joint, can't be assigned to it.
Terms used on this page: continuity, WPQ, WPS.
The other free templates
- Weld map and weld logThe drawing with every joint numbered, the joint list from material to NDT result, and the daily weld log.
- Inspection and test plan (ITP)A complete EXC2 example for welded steel: every check, its criteria and record, and the hold and witness points of each party.
- WPS templateA welding procedure specification laid out to ISO 15609-1, with ASME IX notes and a filled-in 135 (MAG) example.
- Free calculatorsHeat input, carbon equivalent and minimum preheat.
We'll show you on one of your jobs.
A demo on one of your real jobs. We'll write back by tomorrow.
Book a demo