Material & heat traceability Included in Weldtrack, Inspecta.
Links every plate and pipe to its 3.1 certificate and the joints it went into.
What it does.
For those who must prove where material comes from.
- Certificate register. EN 10204 2.2 / 3.1 / 3.2 documents held against the material they certify.
- Heat-number binding. Cast/heat numbers linked to the joints and parts they became — traceability by construction.
- Where-used. From a certificate or a heat, the joints and assemblies it appears in — and the reverse.
- Document-type check. What the contract requires (3.1 vs 3.2) against what you hold, flagged when short.
- Feeds the dossier. The material certificates section of the MRB/MDR assembles itself from this register.
How it works.
-
Register the material with its certificate
Each material carries its inspection document — the EN 10204 type 2.2, 3.1 or 3.2 mill test certificate (MTC) — and the heat/cast number it was supplied under.
-
Bind heat to the work
The heat number is attached to the joints and components it went into, so "which cert covers this weld" is a link, not a search.
-
Prove the document type
Where the contract requires a 3.1 or a 3.2, the register shows what you actually hold against what's required — before the audit, not during it.
What changes.
Today
At the audit you hunt for the right certificate in a folder of PDFs.
With Worgify
From the joint you reach the heat and its certificate in one click.
Where it sits.
Standards it follows
In detail
Traceability is a link, not a search
The material certificate is one of the first things a client’s auditor opens, and one of the easiest to lose track of: the plate arrives with its heat number stamped, the certificate arrives by email, and the two stay linked only in someone’s head.
This module holds the certificate against the material and binds the heat number to the joints the material went into. “Which certificate covers this weld” becomes a link you follow, and the material-certificate section of the handover dossier assembles from it rather than being gathered at the end.
What steel traceability means
Traceability means being able to say, for every part of a structure or a vessel, which plate, section or pipe it came from, under which heat number, and which certificate vouches for its chemistry and mechanical properties. It is built forwards: at goods-in, at cutting, at fit-up, at welding. Rebuilding it backwards at handover, from delivery notes and memory, is exactly what everyone is trying to avoid.
Heat number marking
The heat number arrives on the material from the mill, stamped or stencilled. The weak point is cutting: when one plate becomes ten parts, the number stays on one of them. So before cutting, the marking is transferred to every part that comes out of it — by stamp, marker or label, as the material and the client’s specification allow — and the transfer is recorded.
In Worgify a part cut from a plate inherits its heat and certificate: the chain stays whole after cutting, and from a joint you reach the document in one click.
What the standards ask
For steel structures, EN 1090-2 asks for constituent products to be traceable from receipt to handover from execution class EXC2 up, with stricter requirements for EXC3 and EXC4. Which inspection document to ask the supplier for — 2.2, 3.1 or 3.2 under EN 10204 — is set by the material, the product standard and the contract. Pressure equipment follows the same principle, under the PED and the construction codes.
By batch or by piece
Often traceability by batch is enough: a group of parts with the same heat and certificate. The contract or the execution class may ask for each piece. Worgify keeps both: batch, heat and certificate stay linked, and where needed you go down to the piece and the joint. See also heat number in the glossary.
We'll show you on one of your jobs.
A demo on one of your real jobs. We'll write back by tomorrow.
Book a demo