Scope · deliverables · readiness

Projects & jobs

A job's real state — welds here, NDT there, certificates in a third place — is scattered, so "is this ready to consign?" is answered by walking the floor and checking three folders.

How it works

  1. 01

    Open the job as a record

    A project holds the client, site, scope and deliverables — the job as a record, not an email thread.

  2. 02

    Everything writes to the job

    Every weld, inspection, certificate and NCR belongs to the project it was done under.

  3. 03

    Read consignment readiness

    Whether the job can be consigned is a status you read, not a walk of the floor and three folders.

What it covers

Project register

Client, site, scope and deliverables — the job as a record, not an email thread.

Everything linked to its job

Every weld, inspection, certificate and NCR belongs to a project.

Consignment readiness

Whether the job can actually be consigned, as one number, not a walk of the floor.

The dossier, scoped to the job

The MRB/MDR for this project assembles from the records that belong to it.

One shared state

A project manager and a quality manager see the same status, not two spreadsheets.

The container that makes traceability mean something

Everything in Worgify writes to a job: a weld belongs to a joint, a joint to an assembly, an assembly to a project. Projects is the container that makes traceability mean something — this record, for this client, on this job, under this regime.

It doesn’t replace your planning or ERP tools; it owns the part specific to provable work, and the handover dossier for the job assembles from the records that belong to it.